CoreSite , Los Angeles, CA
LA1 149,000 SF Data Center. From 2014 to the present 20+ projects, add and modify power distribution for cabinets, cages, and private suites. Including creating construction record 1-lines and plans for the entire facility; fault current, coordination, and arc flash studies.
CoreSite , Los Angeles, CA
LA2 424,000 SF Data Center. From 2014 to the present, 12+ projects add and modify power distribution for cabinets, cages, and private suites serving over 350 networks, cloud, and IT providers. Including extensive ATS coordination, fault current, coordination, and arc flash studies.

Conway Engineering

Credit Suisse First Boston, Auckland, New Zealand
Emergency and UPS power study and upgrade
Credit Suisse First Boston, Auckland, New Zealand
New computer room electrical engineering and all services management
Carter Holt Harvey -
Oxygen Business Solutions, Auckland, New Zealand
Feasibility study for computer room expansion/upgrade to critical use
Merck Sharp & Dohme, Auckland, New Zealand
Tenant improvement 2-floor structured telecommunication-cabling system
NASA Dreyden, Edwards Airforce Base ,CA
New 400 kVA uninterruptible power system
Pacific Bell, Southern, CA
Design of 5 telephone exchange upgrades plus 1 new exchange.
Royal Sun Alliance Building, New Zealand
RMcV Tenant Improvement - 5-floor structured telecommunication-cabling system
Sun Microsystems, Auckland, New Zealand
Tenant Improvement - 2-floor structured telecommunication-cabling system
TRW, El Segundo, CA
Building 103, a 30,000 S.F. electromagnetically shielded computer facility with high-level security systems in accordance with military Tempest specifications. Full RF shielding of all services
Vector Ltd, New Zealand
Domain Center 5-floor tenant improvement. Structured cabling and PABX.

Building Facilities

1100 Glendon Avenue, Los Angeles, CA
The new core of 600,000 S.F. 21-storey fully-gutted & remodeled office building $US2M electrical

Conway Engineering

20 high-rise buildings in Los Angeles, 1992-1997.
Design new emergency power generators and distribution systems
30 High Rise buildings in Los Angeles, CA
Emergency power, lighting, and fire alarm retrofit for 30 high rise buildings to comply with sprinkler retrofit ordinance
400 S. Hope, Los Angeles, CA
Existing 710,000 SF Office Building. Detailed site inspection and calculations for whole building fault current, coordination, and arc flash study. 2017
407 Maple Drive, Beverly Hills, CA
New 300,000 S.F. 6-story office building. $US1.3 million construction
535 N. Brand Blvd, Glendale, CA
Full remodel of core and floors of 110,000 S.F. 11-storey office building

Conway Engineering

533 S. Freemont Los Angeles, CA
Existing 77,000 SF Office Building. Whole building fault current, coordination, and arc flash study. 2015
80 High and Low Rise buildings, Southern, CA
Due diligence reports on over 80 high and low rise buildings to ascertain condition prior to purchase included upgrade recommendations
Arden Realty, Inc. CA
Survey and report on 35-high-rise buildings to ascertain and recommend energy-saving measures. Recommended measures were primarily lighting upgrades and power factor correction. Involved selection and control of 5 national lighting contractors to implement savings in over 200 Arden buildings in Southern CA, totaling 17 million S.F.
Brentwood Shopping Center, Brentwood, CA
Two new 9-unit shopping centers at 4530 and 4550 Balfour Road. Building core and retail tenancy
Credit Suisse First Boston, Auckland, New Zealand
Emergency and UPS power study and upgrade
Credit Suisse First Boston, Auckland, New Zealand
New computer room electrical engineering and all services management

McDonald's Headquarters, Auckland, New Zealand
New 5-storey building $NZ 8M 5000m2 (54,000sf). Project management of mechanical, electrical, and civil works. Engineering of power, lighting, telecommunications, security, and lifts. Included wireless LANs for data and voice

Conway Engineering

Sun Plaza Shopping Mall, Medan, North Sumatra
Conceptual and preliminary design of power and telecommunications for new 160,000m2 (1,700,000sf) shopping mall. Included 8 MVA 100% standby power generation due to local utility company diverting power for residential use from 5pm daily